Repair and strengthening of storage tanks

repair and strengthening of a sump tank (S4907 & S4904) in Fajr-e Jam gas refinery
February 14, 2021
repair and strengthening of an storage tank (TK 101-A) in Fajr-e Jam gas refinery
February 14, 2021
Repair and strengthening of #9002 storage tank of LavanOil Refining Company
April 21, 2018
repair and strengthening of an storage tank (#9012) in Lavan Oil Refining Company
February 17, 2018
reinforcement of underground tanks in Fajr-e Jam gas refinery
August 27, 2017
repair and strengthening of an storage tank (#9017) in Lavan Oil Refining Company
August 27, 2017
repair and strengthening of an storage tank (TK 101-B) in Fajr-e Jam gas refinery
August 27, 2017
Repair and strengthening of an storage tank (TK 8101-C) in Fajr-e Jam gas refinery
February 22, 2017
repair and strengthening of an storage tank(#9009) in Lavan Oil Refining Company
August 1, 2013
Reinforcement of de-salter tank using composite materials in National Iranian South Oilfields Company
May 18, 2013
reinforcement of underground tanks in Siri Island
June 29, 2009

Repair and strengthening of Pipes

repair and strengthening of Heat Exchenger Channels in Lavan Island
August 27, 2017
Repair and strengthening of pump house no.3 in abadan oil refuning co.
August 27, 2017
underwater strengthening and repair of tubular steel offshore structures
July 13, 2017
Repair and strengthening of offshore structures
July 4, 2016
Strengthening of submarine capsules with 600 bar pressure.
July 4, 2016
Strengthening of metallic pipes in Abadan
May 29, 2016
Strengthening of underground pipes in Abadan refinery.
May 29, 2016
Strengthening of GRP pipes in Abadan refinery.
May 29, 2016
Strengthening of pipes with 36 inch diameter in Abadanrefinery.
May 29, 2016
Repair of underground water pipes in Isfahan.
May 29, 2016
Reinforcement of corroded Flare pipe of Forozan platform in Khark island, Fajr Jam Co., Asalooyeh
May 29, 2016
Repair of metallic pipes in Nasr platform
February 16, 2012

Repair and strengthening of damaged concrete structures with Composite Materials

Strengthening of a damaged concrete structure in Bandar Abbas refinery
May 29, 2016
Repair and strengthening of 8 damaged concrete structures in Abadan
May 29, 2016
Repair of concrete structures for holding compressor
May 29, 2016
Strengthening of damaged concrete structure in Zob-Ahan Isfahan Co.
May 29, 2016
Reinforcement of damaged concrete rail-road bridge in Yazd.
May 29, 2016

Polymer concrete and composites parts

Design and manufacturing of water distillation slab using polymer concrete, Jalalieh Water Organization Co.
May 30, 2016
Design and manufacturing of the polymer concrete and composite parts
May 29, 2016
Polymer concrete slabs orZob-Ahan Isfahan Co.
May 29, 2016

Composites structures

Design and manufacturing of Composites dome for School of Computer Science in IUST University.
May 29, 2016
Design and manufacturing of Composites space structures.
May 29, 2016
Design and manufacturing of sandwich panel composites structures
May 29, 2016
Design and construction of composite folded structures
May 29, 2016